Sharm EL-Shekh City Council |

|
1999 |
ASET is the first to install a grid connection system in Egypt. The system was constructed to
feed electricity generated by the solar modules to the public grid in Sharm EL-Shekh City and South Sinai. The system generates approximately 5 KWH/Day. |
Solar Modules: (12) SP75 Siemens Solar Modules with a total Capacity of 900 Wp
Grid Inverter : 1.1 KVA Siemens Grid Inverter. |